whatsapp: 0086-15153112822
Sanitation Trainer

Pipe Installation Trainer, Didactic Equipment

Item No.: ZE4117
ZE4117 Pipe Installation Trainer Educational Equipment Didactic Equipment for college, university, vocational training schools, Polytechnics, engineering development center.
INQUIRY
Description

ZE4117 Pipe Installation Trainer Educational Equipment Didactic Equipment
1: Electric mural boiler (expansion tank, valve, pump included)
2: Isolating valve.
3: Filter. 4: Manometer.
5: Counter.
6: Backflow preventer.
7: Three-way valve.
8: Circulator.
9: Differential pressure valve.
10: Flowmeter.
11: Thermostatic valve handset.
12: Thermometer.
13: Thermostat battery.
14: Balancing valve.
15: Draining.
16: Automatic air vent.
17: Electrical box, regulation.

DESCRIPTION  Mural electric boiler dual voltage of 8.4 kW. 
6 radiators of different models. 
A motorized three-way valve controlled by a regulator. 
A circulator. 
A balancing valve with plug for measuring flow rates. 
A differential valve 
A water supply complies with the regulations 
Copper piping with removable connectors. 
PVC piping. 

Air traps manual and automatic .
Complete electrical box and in accordance with the standards in force.  Fixed device of temperature reading (alcohol thermometer) of pressure (needle manometer) and flow rate measurement (rotameter with floater).
Understanding the operating principle and the technologies of the equipment and hydraulic circuits. 
Know to put into service the installation:  Safety instructions.  Impoundment. 
Startup. 
Device settings  Balancing. 
Knowing to maintain an installation: 
Stopping of an installation. 
Disassembly and reassembly of equipment. 
Hydraulic and electrical wiring. 
Study and measure the hydraulic and electrical physical quantities of the installation: 
Temperature, pressure, flow rate, heating law. 
Study on the dilatation of heat transfer fluid. 
Voltage intensity, power absorbed. 
Perform energy balances of the various elements or all.