ZE3105P Vertical Training Frame Vocational Trainer Workbench School Equipment Training Electrical Training Equipment
I. Product overview 1.1 overview This training device is a double-station structure, each station is equipped with an independent power supply and an experimental mesh board, which can meet the requirements of 2 students to conduct electrical training at the same time. The whole equipment adopts aluminum profile frame structure, industrial profiles with special molds, scientific structure and beautiful appearance. The characteristic of not discoloring. The power box and the instrument box are made of industrial aluminum profiles, with anodized surface treatment, good insulation performance, wear resistance and impact resistance, beautiful appearance and easy to use. 1.2 Features It can be used to conduct subject experiments, basic skills, professional skills and comprehensive skills skills operation training and project design of electrical and related majors, as well as electrician grade assessment, skill appraisal, etc. From general basic circuits to advanced automatic control circuits can be carried out on this device, with great flexibility. The electrical installation board is in the form of a mesh plate. The installation holes are 5*10mm square holes, arranged at an interval of 3mm. It is equipped with a special fixed mounting seat, which can be disassembled and used repeatedly. Conventional electrical components can be directly fixed on the mesh plate, which is convenient to use. The special safety output terminal is equipped with a safety test line to provide power output to prevent electric shock during use, and there is a special ground terminal to provide all-round safety protection. II. Technical parameters 1. Dimensions: 1600×400×1150 mm (length×width×height), industrial aluminum profile column, and the cross-sectional size is not less than 123×34 (length×width). The size of the mesh plate is 640×730MM, and the fixed mounting seat and mounting screws are provided free of charge. 2. Power input: three-phase five-wire AC380±10% 50HZ±10% 3. Power control (each station): The leakage circuit breaker switches on and off the power supply, and has short-circuit protection and leakage protection devices. 4. Output (per station): (1) Three-phase AC 380V±10% 50HZ; single-phase AC 220V±10% 50HZ. (2) DC regulated power supply: 0~30V/3A, coarse adjustment in sections, fine adjustment for each section, adjustment accuracy 1‰, power supply is switching power supply 3A, 0~30V continuously adjustable, 3 and a half digits display voltage, current, with current-limiting short-circuit soft protection and self-recovery functions, and with sound and light alarm functions. 5. Instrument box: equipped with pointer AC voltmeter, ammeter, frequency meter, power meter, power factor meter and single-phase watt-hour meter. III.Supportable training projects: (requires corresponding components) 1. Lighting electric light source and indoor wiring 2. Doorbell and access control system 3. Electrical instrument experiment IV.Can complete the training content Experiment 1 Single switch control circuit Experiment 2 Double switch control circuit Experiment 3 Dimmer switch control circuit of incandescent lamp Experiment 4 Multi-switch control circuit Experiment 5 Fluorescent lamp control circuit Experiment 6 High pressure sodium lamp control circuit Experiment 7 Series control circuit for incandescent lamps Experiment 8 Parallel Control Circuit for Incandescent Lamps Experiment 9 Overload Protection Circuit Experiment 10 Doorbell Circuit Experiment 11 Intercom Doorbell Circuit Experiment 12 Doorbell and Access Control Circuits Experiment 13 Access Control Intercom System Circuit Experiment 14 Installation circuit of voltmeter and ammeter Experiment 15 Installation Circuit for Power Factor Meter Experiment 16 Installation Circuit for Power Meter Experiment 17 Installation circuit of single-phase watt-hour meter